Supply and apply of approved quality system for pile head treatment and insulation 700 MM DIAMETER :-

1-Repair / Re profiling of all Pile Head with concrete.
2-Polymer-modified bituminous coating dressed
around the pile head and continuous or connected to
substructure waterproofing and chamber / angle fillet
considered in corners or edges of piles.
3-One Layer of 4mm thk SBS modified homogeneous
membrane dressed around the pile head and
continues or connected to substructure waterproofing
and chamber/angle fillet considered in corners or
edges or piles.
4- High strength epoxy grout for corner & edge.


  • Terms & Conditions 
  • Prices excluding  VAT.
  • Prices excluding delivery costs
  • Delivery: 2 working days, (Weekend Friday, Saturday and Sunday)

Pile Head Treatment:

Method of Statement for Substructure Waterproofing works  

 Surfaces Preparation for Pile Heads:
The weak concrete layer on the pile head top face needs to be broken until solid/sound concrete is reached.
Remove the weak concrete laitance by wire brushing the concrete surface using clear portable water.

Pile Head Treatment:
Pile head top face needs to be repaired with high-strength cementitious grout.
The waterproofing membrane should be extended over both pile head sides and top face, up to the reinforcing bars limit. 
Pour 30mm of high strength epoxy grout on top and side of pile head to seal the face and side of pile.


 

Specifications for SAB® Pile Head Treatment & Insulation

price Per pile 900 mm or 800 mm or 700mm or 1000 mm