SAB® Solar Protection Membrane
ROOF WATERPROOFING / SAB® ALUMINIUM SURFACE MEMBRANE SYSTEM:
1-Execute a layer of plaster 1.5 cm on the roof.
2-Execute slope corners (skirting) 20cm*20cm along with the barbate.
3-Execute a Cavity 1.5*1.5 cm, along with the barbate over the skirting.
4-One coats of bituminous primed surface.
5-One layer of SBS 4mm thick aluminum surfaced membrane
reinforced with non woven polyester mat 180 g/m2
- Terms & Conditions
- Prices excluding VAT.
- Prices excluding delivery costs
-
Delivery: 2 working days, (Weekend Friday, Saturday and Sunday)