SAB TRON COMBO ROOF
OPTIMISATION METHODOLOGY TO IMPLEMENT THERMAL & MOISTURE INSULATION
The Contractor is referred to the Specifications and Drawings for all details that is related to this Section of the Works, in order to insure full commitment with all the requirements contained therein, thus the thermal & moisture insulation will reach to the required professionalism and effectiveness. More
SAB PRO Waterproofing
-
e threshold either for door or staircase,'' in case of existing'', should be on place and at specific height approximately 30 cm.
-
Ac pipes & water which been placed on the parapet, must be lifted up and higher then insulations layers.
- Ac pipes which been existed in the middle of the roof slab, must be lifted up 40 cm .. More
Bathroom & Wet Area Waterproofing
Balconies, Kitchens, and Toilets.
Recommendations:
1. Water pipes should be placed in place and minimally on height 4 cm.
2. Water pipelines should be installed very carefully above insulation layers, without causing any damages or vandalism.
3. Wet area insulation layers must be implemented, when all ceramic (walls) installation has been completed.
How to implement wet area insulation layers: More