SAB® Membrane Half Pro
Roofing Membrane :
1-Execute a layer of plaster 1.5 cm on the roof.
2-Execute slope corners (skirting) 20cm*20cm along with the barbate.
3-Execute a Cavity 1.5*1.5 cm, along with the barbate over the skirting.
4-One coats of bituminous primed surface.
5-One layer of Membrane APP 4mm thick 180 g/m2
- Estimated Shipment Date 2-3 Days
- Cash on Delivery
- Prices include VAT.
- Prices excluding delivery costs.
- Delivered by SAB Gate