00للدعم الفني 971600541110
1. OPTIMISATION METHODOLOGY OF CRYSTALIZATION SYSTEM The Contractor is referred to the Specifications and Drawings for all details that is related to this Section of the Works, in order to insure full commitment with all the requirements contained therein, thus the thermal & moisture insulation will reach to the required professionalism and effectiveness. Instruction required from Main Contractor: • Insulation works should be implemented by specialized company and should be approved from the consultant; as well it should have minimum 5 years experience. • Electrical conductors and water pipes should be sealed properly, to avoid any water leakage .
Views
- 5029 Total Views
- 3958 Website Views
- 1071 Embeded Views
Actions
- 0 Social Shares
-
10
-
0
- 0 Comments
Share count
-
0
Facebook
-
Twitter
-
0
LinkedIn
Embeds
7
-
100
www.sab-us.com
-
14
161.97.92.48
-
5
www.sab-cs.com
-
6
sab-cs.com
-
8
161.97.92.48:8011
-
154
www.google.com
-
8