Method of application insulated concrete system for the installations according to the standard specifications 0421
1- It is preferable for the main contractor to be fully aware of all specifications and details related to this section of the business, in order to ensure the quality of work and full compliance and adherence to all the conditions listed below.
General Conditions:
The procedures required to be followed by the main contractor before and after performing the concrete insulation works using crystal materials (CA112 / CA113) to be mixed with the concrete:
1- The material CA112 / CA113 as a powder in 25 kg bag.
2- The material must be mixed with water before adding to concrete, based on the ratio (1 kg of the substance to 1.25 water.)
3- The ratio that should be follow (4 kg of the substance with 5 liters of water) to every cubic meter of concrete.
4- The material must be added at the site of implementation.
5- The final mixture must be mixed in the mixing car for a sufficient period of not less than 5 minutes.
6- The site official must carried out concrete tests.
7- Vibrators should be secured in sufficient number to ensure homogeneity of concrete and that nesting does not occur.
8- Adhering to the above-mentioned action steps, the facility will avoid later maintenance work.
• In case that the above mentioned steps are adhered to, the warranty period against leakage is 25 years
General Conditions:
The procedures required to be followed by the main contractor before and after performing the concrete insulation works using crystal materials (CA112 / CA113) to be mixed with the concrete:
1- The material CA112 / CA113 as a powder in 25 kg bag.
2- The material must be mixed with water before adding to concrete, based on the ratio (1 kg of the substance to 1.25 water.)
3- The ratio that should be follow (4 kg of the substance with 5 liters of water) to every cubic meter of concrete.
4- The material must be added at the site of implementation.
5- The final mixture must be mixed in the mixing car for a sufficient period of not less than 5 minutes.
6- The site official must carried out concrete tests.
7- Vibrators should be secured in sufficient number to ensure homogeneity of concrete and that nesting does not occur.
8- Adhering to the above-mentioned action steps, the facility will avoid later maintenance work.
• In case that the above mentioned steps are adhered to, the warranty period against leakage is 25 years
Views
- 4115 Total Views
- 3206 Website Views
- 909 Embeded Views
Actions
- Social Shares
- 3
- 0
- 0 Comments
Share count
- 0 Facebook
- 0 Twitter
- 0 LinkedIn
Embeds 5
- 52 www.sab-us.com
- 5 161.97.92.48:8011
- 16 161.97.92.48
- 154 www.google.com
- 8
-
LAVATEX 2000
12350 Views . -
الوقاية من الحرارة والرطوبة العزل المائي
7518 Views . -
DCL Product Conformity
7210 Views . -
Optimization Methodology To Implement Thermal
6612 Views . -
Wurth sealants & Adhesives
6547 Views . -
AWAZEL PU 250 White
6046 Views . -
VELOSIT® TDS-PC-221-EN_2319 (Plug Cement)
6040 Views . -
طبقات نظام العزل كومبو رووف
5932 Views . -
Approved Materials (TDS) for Sabtron Combo System
5487 Views . -
Fosroc Conbextra EPGP
5342 Views . -
Dr. Fixit PVA BOND.
5183 Views . -
صقل و تنعيم الخرسانة Power floating conc
5015 Views .